Owner: NJDOT | Gloucester and Salem Counties, NJ

Keller Engineers administered the inspection, reporting, and acceptance of this State-funded project comprised of MPT, micro milling, pavement removal, polymerized joint adhesive, tack coat, HMA surface course, high performance thing overlay, slurry seal aggregate, type II, slurry seal emulsion, temporary/permanent traffic stripping, rumble strips, RPMs, stabilized turf and silt fence construction activities. The majority of work is being performed during the night shift (8:00 p.m. – 6:00 a.m.).

Project Statistics

Location: Gloucester and Salem Counties
Completion Date: December, 2019
Size: 10 Miles
Construction Cost: $7.9 Million
Project Manager: Samir D. Mody, PE
Inspector: Ramon Melo, NICET, III
Contact: Jaysheel Patel
Resident Engineer
NJDOT
609-361-3078

Keller Engineers responsibilities included providing the RE with technical support, responses to contractor e-mails, requests for extra work and as-builts. Other administrative responsibilities included the preparation of inspection reports, review of certified payrolls for prime and subcontractors, review of EEO documentation and providing the RE with quantities for the monthly payment vouchers. Reporting was saved into the Site Manager system.